
25,000 m² in Liangshan County: cutting, welding, blasting, painting, assembly.
Steel plate is cut on a CNC plasma table, the main beams are welded with submerged-arc machines on a jig, and the frame is squared before the cross members go in.
Bodies then go to the sandblasting room, then the paint room, then final assembly — axles, suspension, brakes, electrical, tyres.
Every unit passes three checks: frame squareness after welding, brake and electrical function after assembly, and a full load test before shipment.
Dimensions and the finished unit are photographed at each gate, and that photo set goes with the shipping documents.
